Details of Right of Way Available/ Not Available

Details of Right of Way Available/ Not Available

District
Length (Km) 
Available Land as per
Revise Joint Memorandum
signed on 16.10.2025
Available Encumbrance free Land as on 31.05.2026
Total Land yet to be handed
over to the Concessionaire
by the Authority as on
31.05.2026
LHS
RHS
LHS
RHS
LHS
RHS
Total Length in Kasganj District (Km)
18.904
14.619
15.216
15.085
18.359
3.819
0.545
Total Length in Badaun District (Km)
37.496
31.936
28.499
37.428
35.768
0.068
1.728
Total Land (Km)
56.400
46.555
43.715
52.513
54.127
3.887
2.273