|
District
|
Length (Km)
|
Available Land as per
Revise Joint Memorandum signed on 16.10.2025 |
Available Encumbrance free Land as on 31.05.2026
|
Total Land yet to be handed
over to the Concessionaire by the Authority as on 31.05.2026 |
|||
|---|---|---|---|---|---|---|---|
|
LHS
|
RHS
|
LHS
|
RHS
|
LHS
|
RHS
|
||
| Total Length in Kasganj District (Km) |
18.904
|
14.619
|
15.216
|
15.085
|
18.359
|
3.819
|
0.545
|
| Total Length in Badaun District (Km) |
37.496
|
31.936
|
28.499
|
37.428
|
35.768
|
0.068
|
1.728
|
| Total Land (Km) |
56.400
|
46.555
|
43.715
|
52.513
|
54.127
|
3.887
|
2.273
|