Four laning of NH 530B from Kasganj Bypass to Chandan Nagar

Welcome to
GR Kasganj Bypass Private Limited

Four laning of NH 530B from Kasganj Bypass End (Existing Km. 150.100 of NH 530B/Design Km. 123.100) to Chandan Nagar (Existing Km.96.200 of NH 530B/ Design Km. 179.500) section of NH 530B in the State of Uttar Pradesh on HAM mode.

SPV Incorporated on: 18.07.2023

GRIL equity interest control in SPV: 100%

Total Length of the Project: 56.400 km (CA)

Authority: National Highways Authority of India

Independent Engineer: M/s Chaitainya Projects Consultancy LTD, In Joint Venture with MSPARK Futuristics & Associates.

Bid Project Cost: 1085.47 Cr.

Date of LoA: 16.06.2023.

Agreement signed on: 16.01.2024