Four laning of NH 530B from Kasganj Bypass End (Existing Km. 150.100 of NH 530B/Design Km. 123.100) to Chandan Nagar (Existing Km.96.200 of NH 530B/ Design Km. 179.500) section of NH 530B in the State of Uttar Pradesh on HAM mode.
SPV Incorporated on: 18.07.2023
GRIL equity interest control in SPV: 100%
Total Length of the Project: 56.400 km (CA)
Authority: National Highways Authority of India
Independent Engineer: M/s Chaitainya Projects Consultancy LTD, In Joint Venture with MSPARK Futuristics & Associates.
Bid Project Cost: 1085.47 Cr.
Date of LoA: 16.06.2023.
Agreement signed on: 16.01.2024