Details of Right of Way Available/ Not Available

Details of Right of Way Available/ Not Available

District
Length (Km) 
Available Land as per Joint Memorandum signed on 07.04.2025
Available Encumbrance free Land as on 30.06.2025
AD Land yet to be handed over to the Concessionaire by the Authority as on 30.06.2025
Total Land yet to be handed over to the Concessionaire by the Authority as on 30.06.2025
LHS
RHS
LHS
RHS
LHS
RHS
LHS
RHS
Total Length in Kasganj District (Km)
18.904
8.250
8.250
7.440
7.440
0.810
0.810
11.464
11.464
Total Length in Badaun District (Km)
37.496
19.210
19.210
17.510
17.450
1.700
1.760
19.986
20.046
Total Land (Km)
56.400
27.460
27.460
24.950
24.890
2.510
2.570
31.450
31.510